Project Number | Bid Date | Project Title | Agency/Institution | A/E | Estimate Construction Cost | Project Manager | Prebid Tour Date | Prebid Tour Mandatory |
21E2H GPC
|
|
Williams Fieldhouse HVAC & Electrical Systems Replacement
|
UNIVERSITY OF WISCONSIN/
PLATTEVILLE CAMPUS
|
IMEG Corporation
|
$5,400,000
|
Schorr
|
4/3/2024
| No |
21I2O GPC
|
|
Ringling Brothers Business Office Restoration
Elec/HVAC Rebid 4/18, GPC moved to 5/9
|
HISTORICAL SOCIETY/
CIRCUS WORLD MUSEUM, BARABOO
|
InSite Consulting Architects, LLC
|
$2,037,000
|
Wenzel
|
3/19/2024
| No |
22A1H GPC
|
|
Eastern Tower Remediation
|
MILITARY AFFAIRS/
VARIOUS LOCATIONS
|
Edge Consulting Engineers, Inc.
|
$4,553,200
|
Wenzel
|
4/9/2024
| No |
22J2O
(Proposal)
|
|
Generator Room Structural Repairs
|
UNIVERSITY OF WISCONSIN/
WHITEWATER CAMPUS
|
Bloom Companies LLC
|
$220,000
|
Luttrell
|
4/23/2024
| No |
18K2MREBID FP
|
|
Type 1 Juvenile Corrections Facility
FP Rebid 5/8/2024. GPC moved to 5/22/2024.
|
CORRECTIONS/
VARIOUS
|
BWBR Architects, Inc.
|
$54,885,000
|
Hoffmann
|
| No |
23A3K
(Proposal)
|
|
Steam Distribution Repairs
|
CORRECTIONS/
PRAIRIE DU CHIEN CORRECTIONAL FACILITY
|
Ring & DuChateau, LLP
|
$180,000
|
Otremba
|
4/25/2024
| No |
23A3M
(Proposal)
|
|
Water Softener Replacement
|
CORRECTIONS/
PRAIRIE DU CHIEN CORRECTIONAL FACILITY
|
Ring & DuChateau, LLP
|
$220,000
|
Otremba
|
4/25/2024
| No |
23G2B
(Proposal)
|
|
Steam System Replacement
Less than 30 bidding days.
|
UNIVERSITY OF WISCONSIN/
SUPERIOR CAMPUS
|
HVP Design, Inc.
|
$200,000
|
Coddington
|
| No |
22B2R GPC
|
|
HVAC Replacement and Addition of DDC
|
TRANSPORTATION/
DSP - DISTRICT 6
|
HVP Design, Inc.
|
$550,000
|
Pearce
|
3/28/2024
| No |
22D3E GPC
|
|
Construct Joint Operations Facility
|
NATURAL RESOURCES/
MILITARY RIDGE STATE TRAIL
|
HSR Associates, Inc.
|
$2,800,000
|
Schaefer
|
4/11/2024
| No |
23G1H
(Proposal)
|
|
HVAC Upgrades
|
CORRECTIONS/
WAUPUN CORRECTIONAL INSTITUTION, WAUPUN
|
Berners-Schober Associates, Inc.
|
$438,000
|
Pearce
|
4/15/2024
| No |
23G1Y
(Proposal)
|
|
Cell Door Welding
|
CORRECTIONS/
GREEN BAY CORRECTIONAL INSTITUTION
|
Somerville, Inc.
|
$291,800
|
Hoffmann
|
4/16/2024
| No |
23J7B
(Proposal)
|
|
Repair Stair Erosion and Drainage
|
MILITARY AFFAIRS/
ONALASKA
|
Kapur & Associates, Inc.
|
$40,000
|
Yahnke
|
| No |
19K2R-01 AAC
|
|
Wisconsin History Center Existing Site Demolition
AAC Only
|
HISTORICAL SOCIETY/
HISTORICAL SOCIETY, MADISON
|
Continuum Architects + Planners
|
$800,000
|
von Below
|
4/15/2024
4/16/2024
| Yes |
23F1C
(Proposal)
|
|
Deck Replacement and Roof Repairs
|
NATURAL RESOURCES/
YELLOWSTONE LAKE STATE PARK
|
Specialty Engineering Group LLC
|
$164,700
|
Kirchstein
|
| No |
23F2W
(Proposal)
|
|
Warm Storage Building Repairs
|
NATURAL RESOURCES/
WAUTOMA STATION
|
Lien & Peterson Architects, Inc.
|
$123,300
|
Zamzow
|
4/9/2024
| No |
22B3N GPC
|
|
Cooling Tower Replacement
Electrical Rebid 4/17/24. GPC moved to 5/1/2024.
|
CORRECTIONS/
CHIPPEWA VALLEY CORRECTIONAL TREATMENT FACILITY
|
Grumman/Butkus Associates, Ltd.
|
$590,400
|
Ewing
|
3/14/2024
| No |
22F2HREBID GPC
|
|
Roof and Window Replacements
GPC Only
|
NATURAL RESOURCES/
KETTLE MORAINE STATE FOREST-NORTHERN UNIT-IANSR
|
ZS, LLC
|
$850,000
|
Quilling
|
| No |
23C2A
(Proposal)
|
|
8th & 9th Floor Remodel
|
ADMINISTRATION/
ADMINISTRATIVE FACILITIES
|
McGowan Architecture LLC
|
$158,200
|
Crawford
|
4/15/2024
| No |
23E4H
(Proposal)
|
|
Segregation Road Asphalt Replacement
|
CORRECTIONS/
GREEN BAY CORRECTIONAL INSTITUTION
|
Burse Surveying & Engineering Inc
|
$188,000
|
Wischhoff
|
4/19/2024
| No |
23H3D
(Proposal)
|
|
Pavement Replacement
|
CORRECTIONS/
BLACK RIVER CORRECTION CENTER, KOMENSKY
|
Professional Engineering LLC
|
$258,000
|
Wischhoff
|
4/18/2024
| No |
20L1E GPC
|
|
Kitchen Renovations
Fire Protection Rebid 4/16 GPC moved to 4/30
|
VETERANS AFFAIRS/
WISCONSIN VETERANS HOME-UNION GROVE
|
Assemblage Architects
|
$6,400,000
|
Schaefer
|
3/7/2024
| No |
22B3HREBID GPC
|
|
Chimney Repairs
GPC Only.
|
UNIVERSITY OF WISCONSIN/
STOUT CAMPUS
|
Larson Engineering, Inc.
|
$2,000,000
|
Daniel
|
4/4/2024
| No |
23F3P
(Proposal)
|
|
Reconstruct South Parking Lot
|
MILITARY AFFAIRS/
FORT MCCOY
|
Kapur & Associates, Inc.
|
$395,000
|
Yahnke
|
4/16/2024
| No |
23F5M
(Proposal)
|
|
Multi-Building Window Replacement
|
NATURAL RESOURCES/
PATTISON STATE PARK
|
Meyer Group Architecture P C
|
$117,500
|
Balciunas
|
4/9/2024
| No |
23J5P
(Proposal)
|
|
Roof and Parapet Repairs
|
UNIVERSITY OF WISCONSIN/
MILWAUKEE CAMPUS
|
Engberg Anderson, Inc.
|
$245,000
|
Hoffman
|
4/11/2024
| No |
21E2H MEP
|
|
Williams Fieldhouse HVAC & Electrical Systems Replacement
|
UNIVERSITY OF WISCONSIN/
PLATTEVILLE CAMPUS
|
IMEG Corporation
|
$5,400,000
|
Schorr
|
4/3/2024
| No |
21L1UREBID2 GPC
|
|
Elevator Upgrades
|
CORRECTIONS/
CHIPPEWA VALLEY CORRECTIONAL TREATMENT FACILITY
|
Lien & Peterson Architects, Inc.
|
$770,000
|
Hoffmann
|
| No |
22A1H MEP
|
|
Eastern Tower Remediation
|
MILITARY AFFAIRS/
VARIOUS LOCATIONS
|
Edge Consulting Engineers, Inc.
|
$4,553,200
|
Wenzel
|
4/9/2024
| No |
22C4Q GPC
|
|
X Building Heating Pipe Replacement
|
CORRECTIONS/
DODGE CORRECTIONAL INSTITUTION, WAUPUN
|
Oneida Total Integrated Enterprises (OTIE)
|
$500,000
|
Otremba
|
| No |
23F5G
(Proposal)
|
|
Multiple Building Roof and Window Replacements
|
NATURAL RESOURCES/
JOHN MICHAEL KOHLER STATE PARK
|
KonText Architects, LLC
|
$270,000
|
Kolaszewski
|
4/11/2024
| No |
23G1S
(Proposal)
|
|
Paving Phase 2
|
CORRECTIONS/
FOX LAKE CORRECTIONAL INSTITUTION, FOX LAKE
|
Collins Engineers, Inc.
|
$380,000
|
Wischhoff
|
4/16/2024
| No |
23H3E
(Proposal)
|
|
Kolb Center Pavement Replacement
|
CORRECTIONS/
FOX LAKE CORRECTIONAL INSTITUTION, FOX LAKE
|
Collins Engineers, Inc.
|
$148,000
|
Wischhoff
|
4/16/2024
| No |
18K2M MEP
|
|
Type 1 Juvenile Corrections Facility
FP Rebid 5/8/2024. GPC moved to 5/22/2024.
|
CORRECTIONS/
VARIOUS
|
BWBR Architects, Inc.
|
$54,885,000
|
Hoffmann
|
4/3/2024
| No |
22D3D GPC
|
|
Replace Underground Fuel Storage Tank
GPC Only
|
MILITARY AFFAIRS/
FORT MCCOY
|
GEI Consultants, Inc.
|
$453,400
|
Archimede
|
4/2/2024
| No |
23C2B
(Proposal)
|
|
Fish Return Pipe Upgrade
|
NATURAL RESOURCES/
ROOT RIVER STEELHEAD
|
Foth Infrastructure & Environment LLC
|
$65,000
|
Kalscheur
|
| No |
23H1M
(Proposal)
|
|
Water Heaters Replacement
|
CORRECTIONS/
GORDON CORRECTION CENTER, GORDON
|
LHB Inc
|
$215,000
|
Windus
|
4/10/2024
| No |
23I3L
(Proposal)
|
|
Concrete Sidewalk Replacement
|
UNIVERSITY OF WISCONSIN/
PARKSIDE CAMPUS
|
Christopher Kidd & Associates, LLC
|
$350,000
|
Hall
|
| No |
22B2R MEP
|
|
HVAC Replacement and Addition of DDC
|
TRANSPORTATION/
DSP - DISTRICT 6
|
HVP Design, Inc.
|
$550,000
|
Pearce
|
3/28/2024
| No |
22D3E MEP
|
|
Construct Joint Operations Facility
|
NATURAL RESOURCES/
MILITARY RIDGE STATE TRAIL
|
HSR Associates, Inc.
|
$2,800,000
|
Schaefer
|
4/11/2024
| No |
22K3BREBID GPC
|
|
Traffic Coating and Minor Repairs
GPC Only
|
ADMINISTRATION/
ADMINISTRATIVE FACILITIES
|
Shive-Hattery
|
$2,413,700
|
List
|
4/10/2024
| No |
23H1N
(Proposal)
|
|
Door Replacements
|
CORRECTIONS/
LINCOLN HILLS SCHOOL, MERRILL
|
Berners-Schober Associates, Inc.
|
$185,000
|
Kolaszewski
|
3/21/2024
| No |
24A1E
(Proposal)
|
|
Chimney Stack Repairs
|
UNIVERSITY OF WISCONSIN/
OSHKOSH CAMPUS
|
Larson Engineering, Inc.
|
$150,000
|
Jansen
|
| No |
19J4E-02 GPC
|
|
New Health and Science Building
MEP moved to 4/4/24 / GPC moved to 4/18/24
|
UNIVERSITY OF WISCONSIN/
EAU CLAIRE CAMPUS
|
Potter Lawson, Inc.
|
$245,000,000
|
Anderson
|
2/14/2024
| No |
21I2OREBID MEP
|
|
Ringling Brothers Business Office Restoration
HVAC/Elec Rebid 4/18, GPC moved to 5/9
|
HISTORICAL SOCIETY/
CIRCUS WORLD MUSEUM, BARABOO
|
InSite Consulting Architects, LLC
|
$2,037,000
|
Wenzel
|
| No |
21K1P-02 EQUIPMENT
|
|
Medium Voltage Switchgear Equipment Purchase
Bidders must be DOA Equipment Supplier certified.
|
UNIVERSITY OF WISCONSIN/
MILWAUKEE CAMPUS
|
Ring & DuChateau, LLP
|
$120,000
|
Otremba
|
| No |
23F2U
(Proposal)
|
|
Shop Siding and Windows
|
NATURAL RESOURCES/
BIG FOOT BEACH STATE PARK
|
Strang, Inc.
|
$105,000
|
Wischhoff
|
4/9/2024
| No |
23I3M
(Proposal)
|
|
Muir Drive Street Lighting Upgrade
Less than 30 bidding days
|
HEALTH SERVICES/
MENDOTA MENTAL HEALTH INSTITUTE, MADISON
|
Design Engineers
|
$189,000
|
Whitley
|
4/3/2024
| No |
21H2F STC
|
|
HVAC and Controls Upgrade
STC Mechanical- Bid Date moved to 4/17 per Add 1
|
VETERANS AFFAIRS/
WISCONSIN VETERANS HOME-KING
|
Berners-Schober Associates, Inc.
|
$3,236,500
|
Pearce
|
3/7/2024
| No |
22B3NREBID ELECTRICAL
|
|
Cooling Tower Replacement
Electrical Rebid 4/17/24. GPC moved to 5/1/2024.
|
CORRECTIONS/
CHIPPEWA VALLEY CORRECTIONAL TREATMENT FACILITY
|
Grumman/Butkus Associates, Ltd.
|
$590,400
|
Ewing
|
| No |
23B1F GPC
|
|
Climbing Wall Replacement
|
UNIVERSITY OF WISCONSIN/
LA CROSSE CAMPUS
|
Dan Beyer Architects
|
$846,600
|
Yahnke
|
3/12/2024
| No |
23F3A
(Proposal)
|
|
Flowage Repairs
|
NATURAL RESOURCES/
NAVARINO WILDLIFE AREA
|
Becher Hoppe Associates Inc
|
$330,000
|
Kolaszewski
|
| No |
23I2P
(Proposal)
|
|
Campus Lab Farm Catch Basin Addition
|
UNIVERSITY OF WISCONSIN/
RIVER FALLS CAMPUS
|
Cedar Corporation
|
$54,000
|
Yahnke
|
3/26/2024
| No |
23I4I
(Proposal)
|
|
Temporary Shoring
Less than 30 bidding days.
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
|
InSite Consulting Architects, LLC
|
$135,000
|
Quilling
|
4/5/2024
| No |
20L1EREBID FP
|
|
Kitchen Renovations
Fire Protection Rebid 4/16 GPC moved to 4/30
|
VETERANS AFFAIRS/
WISCONSIN VETERANS HOME-UNION GROVE
|
Assemblage Architects
|
$6,400,000
|
Schaefer
|
| No |
22K3A GPC
|
|
Roadway and Parking Lot Improvements
GPC Only
|
HEALTH SERVICES/
SECURE TREATMENT FACILITY, MAUSTON
|
Kapur & Associates, Inc.
|
$1,599,800
|
Yahnke
|
4/2/2024
| No |
23A3A
(Proposal)
|
|
Trail Improvements
|
NATURAL RESOURCES/
NORTHERN HIGHLAND STATE FOREST
|
Clark Dietz, Inc.
|
$199,000
|
Shumaker
|
| No |
23E5M
(Proposal)
|
|
Lighting Upgrade
|
UNIVERSITY OF WISCONSIN/
PARKSIDE CAMPUS
|
Ring & DuChateau, LLP
|
$125,000
|
Whitley
|
| No |
23F2M
(Proposal)
|
|
Window Replacement
|
CORRECTIONS/
GORDON CORRECTION CENTER, GORDON
|
KonText Architects, LLC
|
$183,400
|
Quilling
|
3/29/2024
| No |
23J1V
(Proposal)
|
|
University Service Center Paving
|
UNIVERSITY OF WISCONSIN/
SUPERIOR CAMPUS
|
Advanced Engineering Concepts
|
$254,000
|
Wischhoff
|
4/5/2024
| No |
21L1UREBID2 MEP
|
|
Elevator Upgrades
|
CORRECTIONS/
CHIPPEWA VALLEY CORRECTIONAL TREATMENT FACILITY
|
Lien & Peterson Architects, Inc.
|
$770,000
|
Hoffmann
|
| No |
22C4Q MEP
|
|
X Building Heating Pipe Replacement
|
CORRECTIONS/
DODGE CORRECTIONAL INSTITUTION, WAUPUN
|
Oneida Total Integrated Enterprises (OTIE)
|
$500,000
|
Otremba
|
| No |
22D3G
(Proposal)
|
|
Shooting Range Expansion
|
NATURAL RESOURCES/
TURTLE FLAMBEAU SCENIC WATERS AREA
|
Short Elliott Hendrickson, Inc.
|
$265,000
|
Kolaszewski
|
| No |
23E1P
(Proposal)
|
|
Ceiling Replacements
|
CORRECTIONS/
RACINE YOUTH OFFENDER CORRECTIONAL FACILITY
|
Boer Architects Inc
|
$52,000
|
Zamzow
|
3/20/2024
| No |
18K1G GPC
|
|
Readiness Center Replacement
|
MILITARY AFFAIRS/
VIROQUA
|
Assemblage Architects
|
$25,000,000
|
Schaefer
|
3/14/2024
| No |
23F2H
(Proposal)
|
|
Stairwell Repair
|
UNIVERSITY OF WISCONSIN/
STEVENS POINT CAMPUS
|
Cedar Corporation
|
$103,000
|
Wenzel
|
3/25/2024
| No |
21L3QREBID2 GPC
|
|
Unit 4 Roof Replacement
GPC Only.
|
CORRECTIONS/
STANLEY CORRECTIONAL INSTITUTION, STANLEY
|
Lien & Peterson Architects, Inc.
|
$592,000
|
Hoffmann
|
| No |
19J4E-02 MEP
|
|
New Health and Science Building
MEP moved to 4/4/24 / GPC moved to 4/18/24
|
UNIVERSITY OF WISCONSIN/
EAU CLAIRE CAMPUS
|
Potter Lawson, Inc.
|
$245,000,000
|
Anderson
|
2/14/2024
| No |
23A1V GPC
|
|
North Steam Improvements
|
HEALTH SERVICES/
CENTRAL WISCONSIN CENTER, MADISON
|
K Singh & Associates Inc
|
$3,000,000
|
Otremba
|
3/7/2024
| No |
21I2O MEP
|
|
Ringling Brothers Business Office Restoration
|
HISTORICAL SOCIETY/
CIRCUS WORLD MUSEUM, BARABOO
|
InSite Consulting Architects, LLC
|
$2,037,000
|
Wenzel
|
3/19/2024
| No |
23B1F MEP
|
|
Climbing Wall Replacement
|
UNIVERSITY OF WISCONSIN/
LA CROSSE CAMPUS
|
Dan Beyer Architects
|
$846,600
|
Yahnke
|
3/12/2024
| No |
23E4Q
(Proposal)
|
|
Unit 14 and 15 Door Controls Upgrade
|
CORRECTIONS/
KETTLE MORAINE CI-PLYMOUTH
|
Powrtek Engineering, Inc.
|
$450,000
|
Stehly
|
3/14/2024
| No |
22D2V GPC
|
|
Fairchild Hall Safety and Maintenance Upgrades
|
VETERANS AFFAIRS/
WISCONSIN VETERANS HOME-UNION GROVE
|
CMG & Associates, Inc.
|
$1,360,000
|
Becker
|
2/27/2024
| No |
21K1P-01 EQUIPMENT
|
|
Chiller Purchase
Bidders must be DOA Equipment Supplier certified.
|
UNIVERSITY OF WISCONSIN/
MILWAUKEE CAMPUS
|
Ring & DuChateau, LLP
|
$3,600,000
|
Otremba
|
| No |
22B3N MEP
|
|
Cooling Tower Replacement
Electrical Rebid 4/17/24. GPC moved to 5/1/2024.
|
CORRECTIONS/
CHIPPEWA VALLEY CORRECTIONAL TREATMENT FACILITY
|
Grumman/Butkus Associates, Ltd.
|
$590,400
|
Ewing
|
3/14/2024
| No |
22E2F
(Proposal)
|
|
Cooler/Freezer Refrigeration Systems Replacement
|
CORRECTIONS/
REDGRANITE CORRECTIONAL INSTITUTION, REDGRANITE
|
Henneman Engineering, Inc.
|
$240,000
|
Stephan
|
3/12/2024
| No |
22F2Y GPC
|
|
Elevator Installation
|
UNIVERSITY OF WISCONSIN/
STEVENS POINT CAMPUS
|
Architects Group Limited
|
$785,747
|
Braun-Oddo
|
2/26/2024
| No |
23D2D
(Proposal)
|
|
1965 Meeting Room Remodel
|
UNIVERSITY OF WISCONSIN/
GREEN BAY CAMPUS
|
Architects Group Limited
|
$135,000
|
Kolaszewski
|
3/11/2024
| No |
18K1G MEP
|
|
Readiness Center Replacement
|
MILITARY AFFAIRS/
VIROQUA
|
Assemblage Architects
|
$25,000,000
|
Schaefer
|
3/14/2024
| No |
19J4E-03 GPC
|
|
Chiller and Cooling Tower Replacement
Electrical Rebid 3/13/24. GPC moved to 3/27/2024.
|
UNIVERSITY OF WISCONSIN/
EAU CLAIRE CAMPUS
|
N/A
|
$4,900,000
|
Anderson
|
1/30/2024
| No |
20L1E MEP
|
|
Kitchen Renovations
Fire Protection Rebid 4/16 GPC moved to 4/30
|
VETERANS AFFAIRS/
WISCONSIN VETERANS HOME-UNION GROVE
|
Assemblage Architects
|
$6,400,000
|
Schaefer
|
3/7/2024
| No |
22G1X GPC
|
|
Shooting Range Improvements
|
NATURAL RESOURCES/
KETTLE MORAINE STATE FOREST-SOUTHERN UNIT
|
Strang, Inc.
|
$1,400,000
|
Schaefer
|
2/27/2024
| No |
23D1Z
(Proposal)
|
|
High Pressure Steam Station Repair
|
UNIVERSITY OF WISCONSIN/
STOUT CAMPUS
|
HVP Design, Inc.
|
$182,000
|
Pearce
|
| No |
23F5F
(Proposal)
|
|
Steam Pit Repair
|
UNIVERSITY OF WISCONSIN/
EAU CLAIRE CAMPUS
|
Ayres Associates, Inc.
|
$300,000
|
Cunat
|
3/5/2024
| No |
22J1W
(Proposal)
|
|
HVAC Upgrades
|
NATURAL RESOURCES/
SOUTH CENTRAL REGIONAL OFFICE
|
JDR Engineering, Inc.
|
$451,400
|
Pearce
|
3/11/2024
| No |
22L1S
(Proposal)
|
|
Long Lake Boat Ramp Reconstruction
|
NATURAL RESOURCES/
KETTLE MORAINE STATE FOREST-NORTHERN UNIT-IANSR
|
Short Elliott Hendrickson Inc
|
$250,000
|
Schaefer
|
| No |
23A1S GPC
|
|
Service Drive and Parking Lot Repairs
GPC Only.
|
UNIVERSITY OF WISCONSIN/
MILWAUKEE CAMPUS
|
K Singh & Associates Inc
|
$700,000
|
Hall
|
| No |
23A1V MEP
|
|
North Steam Improvements
|
HEALTH SERVICES/
CENTRAL WISCONSIN CENTER, MADISON
|
K Singh & Associates Inc
|
$3,000,000
|
Otremba
|
3/7/2024
| No |
23F1Q
(Proposal)
|
|
Pedestrian Ramp Replacement
|
UNIVERSITY OF WISCONSIN/
WHITEWATER CAMPUS
|
Collins Engineers, Inc.
|
$97,000
|
Hall
|
| No |
23F4H
(Proposal)
|
|
Exterior Steps Replacement
|
UNIVERSITY OF WISCONSIN/
WHITEWATER CAMPUS
|
JT Engineering, Inc.
|
$188,000
|
Hall
|
| No |
23H3G
(Proposal)
|
|
Parking Lot S and J Resurfacing
|
UNIVERSITY OF WISCONSIN/
STEVENS POINT CAMPUS
|
Professional Engineering LLC
|
$393,300
|
Wenzel
|
| No |
22D2V MEP
|
|
Fairchild Hall Safety and Maintenance Upgrades
|
VETERANS AFFAIRS/
WISCONSIN VETERANS HOME-UNION GROVE
|
CMG & Associates, Inc.
|
$1,360,000
|
Becker
|
2/27/2024
| No |
22K2W
(Proposal)
|
|
Projector Screens Replacement
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
|
Strang, Inc.
|
$240,000
|
Anderson
|
3/5/2024
| No |
22L2D-03 GPC
|
|
Window Replacement and Caulking
GPC Only.
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
|
Berners-Schober Associates, Inc.
|
$442,000
|
Dapp
|
2/21/2024
2/28/2024
| Yes |
23E4O
(Proposal)
|
|
Concrete Replacement
|
CORRECTIONS/
FOX LAKE CORRECTIONAL INSTITUTION, FOX LAKE
|
Professional Engineering LLC
|
$225,000
|
Zamzow
|
3/5/2024
| No |
23F2F
(Proposal)
|
|
Asphalt - Phase 2 Lower Lot
|
CORRECTIONS/
ROBERT ELLSWORTH CORRECTIONAL CENTER, UNION GROVE
|
CEDP, Inc.
|
$254,000
|
Wischhoff
|
| No |
21D3N
(Proposal)
|
|
ATS-1 Replacement
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
|
Ring & DuChateau, LLP
|
$426,500
|
Ewing
|
2/27/2024
| No |
22F2Y MEP
|
|
Elevator Installation
|
UNIVERSITY OF WISCONSIN/
STEVENS POINT CAMPUS
|
Architects Group Limited
|
$785,747
|
Braun-Oddo
|
2/26/2024
| No |
22H2C GPC
|
|
Toilet Shower Building Reconstruction
|
NATURAL RESOURCES/
LAKE WISSOTA STATE PARK
|
Jewell Associates Engineers, Inc.
|
$2,500,000
|
Hall
|
2/6/2024
| No |
23I2R
(Proposal)
|
|
Roof Replacement
|
CORRECTIONS/
BADGER STATE INDUSTRIES, STATEWIDE
|
Specialty Engineering Group LLC
|
$455,700
|
Zamzow
|
2/21/2024
| No |
19E1WREBID
(Proposal)
|
|
Steam Tunnel and Pit Repair
|
UNIVERSITY OF WISCONSIN/
OSHKOSH CAMPUS
|
Berners-Schober Associates, Inc.
|
$250,000
|
Otremba
|
2/28/2024
| No |
19J4E-03REBID ELECTRICAL
|
|
Chiller and Cooling Tower Replacement
Electrical Rebid 3/13/24. GPC moved to 3/27/2024.
|
UNIVERSITY OF WISCONSIN/
EAU CLAIRE CAMPUS
|
N/A
|
$4,900,000
|
Anderson
|
| No |
22G1X MEP
|
|
Shooting Range Improvements
|
NATURAL RESOURCES/
KETTLE MORAINE STATE FOREST-SOUTHERN UNIT
|
Strang, Inc.
|
$1,400,000
|
Schaefer
|
2/27/2024
| No |
23C2M GPC
|
|
Roof Replacements
GPC Only.
|
UNIVERSITY OF WISCONSIN/
STEVENS POINT CAMPUS
|
Specialty Engineering Group LLC
|
$970,000
|
Zamzow
|
2/29/2024
| No |
23H3F
(Proposal)
|
|
Chimney Tuckpointing
|
UNIVERSITY OF WISCONSIN/
EAU CLAIRE CAMPUS
|
Larson Engineering, Inc.
|
$60,000
|
Cunat
|
| No |
21J1S GPC
|
|
Parking Lot and Roads Renovation
|
UNIVERSITY OF WISCONSIN/
GREEN BAY CAMPUS
|
Grumman/Butkus Associates, Ltd.
|
$1,825,000
|
Kolaszewski
|
2/13/2024
| No |
22C3E
(Proposal)
|
|
Boiler Replacement
|
MILITARY AFFAIRS/
MADISON
|
Henneman Engineering, Inc.
|
$363,000
|
Pearce
|
2/21/2024
| No |
23G1J
(Proposal)
|
|
Parking Lot Replacement
|
CORRECTIONS/
MILWAUKEE MEN'S PRERELEASE CENTER, MILWAUKEE
|
Kapur & Associates, Inc.
|
$108,000
|
Hoffman
|
2/13/2024
| No |
22C1N GPC
|
|
Replace POV Parking Lot
|
MILITARY AFFAIRS/
WHITEWATER
|
CEDP, Inc.
|
$580,000
|
Shumaker
|
2/6/2024
| No |
22D3B GPC
|
|
Roof Replacement
GPC Only.
|
UNIVERSITY OF WISCONSIN/
WHITEWATER CAMPUS
|
Specialty Engineering Group LLC
|
$1,172,000
|
Hall
|
2/22/2024
| No |
22G1N
(Proposal)
|
|
Refurbish Lawn and Display Area
|
MILITARY AFFAIRS/
MADISON
|
Strang, Inc.
|
$274,000
|
Wischhoff
|
| No |
23E4C
(Proposal)
|
|
Various Concrete Replacements and Pad Expansions
|
CORRECTIONS/
RACINE CORRECTIONAL INSTITUTION, STURTEVANT
|
Burse Surveying & Engineering Inc
|
$186,000
|
Wischhoff
|
2/21/2024
| No |
23C2DREBID
(Proposal)
|
|
Electric Utility Repairs PMS 9 and 11
Less than 30 bidding days.
|
UNIVERSITY OF WISCONSIN/
RIVER FALLS CAMPUS
|
Timper Associates Engineers LLC
|
$150,000
|
McChesney
|
| No |
21E2S GPC
|
|
Multi-Building Elevator Replacement and Modernization
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
|
Tactical Design North, Inc.
|
$5,670,000
|
Balciunas
|
1/31/2024
| No |
23C1T
(Proposal)
|
|
Door and Window Replacements
|
HEALTH SERVICES/
SECURE TREATMENT FACILITY, MAUSTON
|
KonText Architects, LLC
|
$292,000
|
Balciunas
|
2/15/2024
| No |
21I1H GPC
|
|
New Health Services Unit and Restrictive Housing Unit Expansion
|
CORRECTIONS/
Wisconsin Secure Program Facility
|
Venture Architects
|
$5,700,000
|
Hoffmann
|
1/25/2024
| No |
22H2C MEP
|
|
Toilet Shower Building Reconstruction
|
NATURAL RESOURCES/
LAKE WISSOTA STATE PARK
|
Jewell Associates Engineers, Inc.
|
$2,500,000
|
Hall
|
2/6/2024
| No |
22I2L
(Proposal)
|
|
Roadway Repairs
|
NATURAL RESOURCES/
HARRINGTON BEACH STATE PARK
|
KL Engineering, Inc.
|
$385,000
|
Anderson
|
| No |
23C1A GPC
|
|
Cooling Tower Replacement
|
UNIVERSITY OF WISCONSIN/
STEVENS POINT CAMPUS
|
Ring & DuChateau, LLP
|
$750,000
|
Otremba
|
1/22/2024
| No |
23F2Q
(Proposal)
|
|
Tank Fall Protection System
|
UNIVERSITY OF WISCONSIN/
SUPERIOR CAMPUS
|
Larson Engineering, Inc.
|
$38,000
|
Daniel
|
| No |
19J4E-03 MEP
|
|
Chiller and Cooling Tower Replacement
Electrical Rebid 3/13/24. GPC moved to 3/27/2024.
|
UNIVERSITY OF WISCONSIN/
EAU CLAIRE CAMPUS
|
N/A
|
$4,900,000
|
Anderson
|
1/30/2024
| No |
22A2M GPC
|
|
Boiler Replacement
|
CORRECTIONS/
STANLEY CORRECTIONAL INSTITUTION, STANLEY
|
KFI Engineers, PC
|
$2,900,000
|
Daniel
|
1/31/2024
| No |
23B1E
(Proposal)
|
|
Restroom Renovation
Bidding rescheduled to 2/28/2024.
|
UNIVERSITY OF WISCONSIN/
LA CROSSE CAMPUS
|
HSR Associates, Inc.
|
$430,100
|
Yahnke
|
1/16/2024
| No |
21J1S MEP
|
|
Parking Lot and Roads Renovation
|
UNIVERSITY OF WISCONSIN/
GREEN BAY CAMPUS
|
Grumman/Butkus Associates, Ltd.
|
$1,825,000
|
Kolaszewski
|
2/13/2024
| No |
22D1L GPC
|
|
Reconstruct Parking Lots and Fencing
|
MILITARY AFFAIRS/
NEILLSVILLE
|
KL Engineering, Inc.
|
$1,021,900
|
Balciunas
|
1/25/2024
| No |
22I2N GPC
|
|
Renovate Boat Landings
GPC Only, Bidding moved to 2/27 per Add 2
|
NATURAL RESOURCES/
NORTHERN HIGHLAND STATE FOREST
|
Becher Hoppe Associates Inc
|
$470,000
|
Kolaszewski
|
| No |
23A1ZREBID
(Proposal)
|
|
Hydronic Heating Loop Replacement
|
CORRECTIONS/
KETTLE MORAINE CI-PLYMOUTH
|
Ring & DuChateau, LLP
|
$135,000
|
Cunat
|
| No |
23F2B
(Proposal)
|
|
PIOC Bathroom Renovation
|
CORRECTIONS/
FLAMBEAU CORRECTION CENTER, HAWKINS
|
Cedar Corporation
|
$130,000
|
Balciunas
|
2/13/2024
| No |
20A3LREBID2 GPC
|
|
Administration Building Expansion
|
VETERANS AFFAIRS/
SOUTHERN WI VETERANS MEMORIAL CEMETERY-UNION GROVE
|
McGowan Architecture LLC
|
$2,160,000
|
Wischhoff
|
1/24/2024
| No |
22C1N MEP
|
|
Replace POV Parking Lot
|
MILITARY AFFAIRS/
WHITEWATER
|
CEDP, Inc.
|
$580,000
|
Shumaker
|
2/6/2024
| No |
22C2X GPC
|
|
Neillsville Radio Tower Replacement
GPC Only
|
TRANSPORTATION/
DSP - DISTRICT 6
|
Bloom Companies LLC
|
$661,600
|
Wenzel
|
2/6/2024
| No |
23A3XREBID
(Proposal)
|
|
Heating Loop Replacement
|
CORRECTIONS/
REDGRANITE CORRECTIONAL INSTITUTION, REDGRANITE
|
Ring & DuChateau, LLP
|
$190,000
|
Cunat
|
| No |
23B2T
(Proposal)
|
|
Boiler Replacements
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
|
Henneman Engineering, Inc.
|
$223,000
|
Pearce
|
2/8/2024
| No |
23E1N
(Proposal)
|
|
Chilled Water Equipment Repairs
|
HEALTH SERVICES/
SOUTHERN WISCONSIN CENTER, UNION GROVE
|
Accendis Consulting Engineers, LLC
|
$180,400
|
Pearce
|
2/6/2024
| No |
21H1M STC
|
|
15kV Cable Replacement
Single Trade Contract - Electrical
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
|
Affiliated Engineers, Inc.
|
$3,900,000
|
McChesney
|
2/1/2024
| No |
21L1UREBID GPC
|
|
Elevator Upgrades
Electrical Rebid 2/7/24. GPC moved to 2/21/2024.
|
CORRECTIONS/
CHIPPEWA VALLEY CORRECTIONAL TREATMENT FACILITY
|
Lien & Peterson Architects, Inc.
|
$770,000
|
Hoffmann
|
12/21/2023
| No |
22F2H GPC
|
|
Roof and Window Replacements
GPC Only
|
NATURAL RESOURCES/
KETTLE MORAINE STATE FOREST-NORTHERN UNIT-IANSR
|
ZS, LLC
|
$544,000
|
Quilling
|
2/6/2024
| No |
22L2R
(Proposal)
|
|
Domestic Water Service Upgrade
|
UNIVERSITY OF WISCONSIN/
STOUT CAMPUS
|
Salas O’Brien North, LLC
|
$200,000
|
Windus
|
2/6/2024
| No |
23E4K
(Proposal)
|
|
Chapel Roof Replacement
|
CORRECTIONS/
OAKHILL CORRECTIONAL INSTITUTION, OREGON
|
KonText Architects, LLC
|
$120,000
|
Alderman
|
2/7/2024
| No |
21E2S MEP
|
|
Multi-Building Elevator Replacement and Modernization
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
|
Tactical Design North, Inc.
|
$5,670,000
|
Balciunas
|
1/31/2024
| No |
22D2GREBID
(Proposal)
|
|
Loading Dock Concrete Replacement
|
CORRECTIONS/
OSHKOSH CORRECTIONAL INSTITUTION, OSHKOSH
|
MxGrp, Inc.
|
$181,200
|
Hoffmann
|
1/22/2024
| No |
22I1P STC
|
|
Boiler Replacements
STC - Mechanical
|
CORRECTIONS/
WINNEBAGO CORRECTION CENTER
|
Grumman/Butkus Associates, Ltd.
|
$619,300
|
Daniel
|
2/1/2024
| No |
22K3B GPC
|
|
Traffic Coating and Minor Repairs
GPC Only
|
ADMINISTRATION/
ADMINISTRATIVE FACILITIES
|
Shive-Hattery
|
$2,413,700
|
List
|
1/25/2024
| No |
22L2J
(Proposal)
|
|
HSU AC Replacement
|
CORRECTIONS/
REDGRANITE CORRECTIONAL INSTITUTION, REDGRANITE
|
Henneman Engineering, Inc.
|
$135,000
|
Stephan
|
2/6/2024
| No |
23E2F
(Proposal)
|
|
Door Control Upgrades
|
CORRECTIONS/
REDGRANITE CORRECTIONAL INSTITUTION, REDGRANITE
|
Powrtek Engineering, Inc.
|
$92,000
|
Stehly
|
2/6/2024
| No |
21D3R GPC
|
|
B Tower Ventilation Renovation
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
|
Grumman/Butkus Associates, Ltd.
|
$2,330,000
|
Schorr
|
1/12/2024
| No |
21I1H MEP
|
|
New Health Services Unit and Restrictive Housing Unit Expansion
|
CORRECTIONS/
Wisconsin Secure Program Facility
|
Venture Architects
|
$5,700,000
|
Hoffmann
|
1/25/2024
| No |
23C1A MEP
|
|
Cooling Tower Replacement
|
UNIVERSITY OF WISCONSIN/
STEVENS POINT CAMPUS
|
Ring & DuChateau, LLP
|
$750,000
|
Otremba
|
1/22/2024
| No |
23F5K
(Proposal)
|
|
Well House Reconstruction
|
NATURAL RESOURCES/
PENINSULA STATE PARK
|
Berners-Schober Associates, Inc.
|
$135,000
|
Kolaszewski
|
| No |
21E2G GPC
|
|
Envelope Repair and Replacement
GPC Only.
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
|
InSite Consulting Architects, LLC
|
$5,617,000
|
Quilling
|
1/23/2024
| No |
22A2M MEP
|
|
Boiler Replacement
|
CORRECTIONS/
STANLEY CORRECTIONAL INSTITUTION, STANLEY
|
KFI Engineers, PC
|
$2,900,000
|
Daniel
|
1/31/2024
| No |
22C3GREBID GPC
|
|
North Building Roof Replacement
GPC Only - Less than 30 Bidding Days
|
HEALTH SERVICES/
WISCONSIN RESOURCE CENTER, WINNEBAGO
|
InSite Consulting Architects, LLC
|
$2,178,000
|
Zamzow
|
2/6/2024
| No |
16A1T GPC
|
|
Champions Hall Addition
|
UNIVERSITY OF WISCONSIN/
STEVENS POINT CAMPUS
|
Kahler Slater, Inc.
|
$25,700,000
|
Braun-Oddo
|
1/16/2024
| No |
22B3H GPC
|
|
Chimney Repairs
GPC Only.
|
UNIVERSITY OF WISCONSIN/
STOUT CAMPUS
|
Larson Engineering, Inc.
|
$1,631,500
|
Daniel
|
1/24/2024
| No |
22D1L MEP
|
|
Reconstruct Parking Lots and Fencing
|
MILITARY AFFAIRS/
NEILLSVILLE
|
KL Engineering, Inc.
|
$1,021,900
|
Balciunas
|
1/25/2024
| No |
23E4R
(Proposal)
|
|
Old Main Sanitary Drain Replacement
|
UNIVERSITY OF WISCONSIN/
STEVENS POINT CAMPUS
|
KL Engineering, Inc.
|
$79,500
|
Wenzel
|
1/25/2024
| No |