IMPORTANT NEWS & UPDATES: 

Transitioning from WisBuild to eBuilder:

In our ongoing efforts to enhance efficiency, streamline our processes, and improve collaboration, we will be transitioning all bid advertising activities from WisBuild to eBuilder. This transition will provide a more integrated and user-friendly platform for bid management.

  1. Create an eBuilder Bidding Portal Account:

Important First Step! Prior to May 14, 2024, please navigate to the eBuilder List of Projects out for Bid website to create your eBuilder Bidding Portal Account.

  1. Once on this page, find the “Demonstration Bid Package” project, click that project link and you will be taken to a landing page for the project.
  2. Once on that landing page, navigate to “View Bid Package and Addenda on e-Builder (sign-in required)” – here you will be prompted to sign in or create a Bidding Portal account. Please note for security purposes, this account log in is separate from the standard eBuilder account log in used for project access.

    - If this is your first-time using the eBuilder Bidding Portal, choose “Create Account” under “Are you a first time bidder?”

    - After logging into the Bid Portal, confirm your company and contact details, then click save.

    - After you have completed the above steps, there is no further action needed.

Revised Bidding Instructions for eBuilder:

Alongside this transition, we are implementing new bidding documents with revised instructions specifically tailored for the eBuilder platform. Please find below a summary of the revised bidding instructions:

  1. Accessing the Bid Package:
    • Navigate to the new projects out for bid page and select the project of interest.
    • Click on the unique bid package link to access the eBuilder Bidding Portal.
    • Please note that the login credentials for the bidding portal will differ from your standard eBuilder Single Sign-On account login.
    • If this is your first time bidding, navigate to the unique bidding link and choose “Create Account” under “Are you a first time bidder?”
    • After logging into the Bid Portal, confirm your company and contact details, then click save.
    • Upon logging in to the project, locate and "Accept" the package invitation.
  2. Viewing and Downloading Documents:
    • Navigate to the "Invitation Documents" tab to view and download all relevant project documents.
    • Any additional addenda notifications will be accessible under the "Addenda" section. Ensure to download the addenda files from the "Invitation Documents" tab.
  3. Submitting Your Bid:
    • Return to the bidding portal and proceed to the "Response Form" section.
    • Step 1: Enter your bid amount and total cost in the designated fields.
    • Step 2: Upload your Bid Bond and Bid Form documents as required.
    • Step 3: Acknowledge any applicable addenda. Note:  while acknowledging addenda in the bid portal is essential, it is not the only acknowledgement required. Ensure that all addenda are acknowledged on the provided lines of the DFD Bid Form to avoid potential rejection.

 We understand that adapting to these changes may require some adjustment, and we are here to support you throughout the transition process. Should you have any questions or require assistance, please do not hesitate to contact our team at DOADFDAdminServices@wisconsin.gov.

--------------------------------------------------------------------------------------------------------------------------------------------------------

Instructions to view plans from the List of Projects out for Bid Below:

  • To view bidding documents click on the project title.
  • To view a DFD plan holders list, click on the “Plan Holders” link next to the project number.  Plan holders lists are provided as a courtesy, DFD is not responsible for any errors or inaccuracies. The plan holders lists do not necessarily reflect all possible bidders.
  • If a revised date is displayed under the project number, click on the underlined date to display a description of the revisions.
  • To view a list of projects already bid, including bid opening tabulations and construction contracts that have been issued, click on the 'Bid Results' link to the left.
  • Please note that an RSS feed of this page is available by clicking on the following icon Subscribe to RSS Feed
  • Notices of Proprietary Acquisition are located at the bottom of this page.   

---------------------------------------------------------------------------------------------------------------------------------------------------------

 

To view current eBuilder Opportunities and results

Navigate to: eBuilder Bidding Opportunities and Results

 

 

 

List of Projects Out for Bid
Thursday, Mar 28 2024
Project NumberPlans Available OnBid DateProject Title/Bid DocumentsAgency/Institution/BuildingA/EEstimate Construction CostProject ManagerPrebid Tour DatePrebid Tour Mandatory
21E2H GPC 3/25/2024
Plan Holders
5/9/2024 Williams Fieldhouse HVAC & Electrical Systems Replacement UNIVERSITY OF WISCONSIN/
PLATTEVILLE CAMPUS
/
WILLIAMS FIELDHOUSE
IMEG Corporation $5,400,000 Schorr 4/3/2024 No
22A1H GPC 3/12/2024
Plan Holders
5/9/2024 Eastern Tower Remediation MILITARY AFFAIRS/
VARIOUS LOCATIONS
Edge Consulting Engineers, Inc. $4,553,200 Wenzel 4/9/2024 No
18K2M GPC 3/25/2024
Plan Holders
5/8/2024 Type 1 Juvenile Corrections Facility CORRECTIONS/
VARIOUS
BWBR Architects, Inc. $54,885,000 Hoffmann 4/3/2024 No
23A3K
(Proposal)
3/25/2024
Plan Holders
5/8/2024 Steam Distribution Repairs CORRECTIONS/
PRAIRIE DU CHIEN CORRECTIONAL FACILITY
/
BUILDING 11-HEATING PLANT
Ring & DuChateau, LLP $180,000 Otremba 4/25/2024 No
23A3M
(Proposal)
3/25/2024
Plan Holders
5/8/2024 Water Softener Replacement CORRECTIONS/
PRAIRIE DU CHIEN CORRECTIONAL FACILITY
/
BUILDING 11-HEATING PLANT
Ring & DuChateau, LLP $220,000 Otremba 4/25/2024 No
22B2R GPC 3/21/2024
Plan Holders
5/7/2024 HVAC Replacement and Addition of DDC TRANSPORTATION/
DSP - DISTRICT 6
/
DSP DIST HDQ-EAU CLAIRE
HVP Design, Inc. $550,000 Pearce 3/28/2024 No
22D3E GPC 3/14/2024
Plan Holders
5/7/2024 Construct Joint Operations Facility NATURAL RESOURCES/
MILITARY RIDGE STATE TRAIL
HSR Associates, Inc. $2,800,000 Schaefer 4/11/2024 No
23G1H
(Proposal)
3/20/2024
Plan Holders
5/7/2024 HVAC Upgrades CORRECTIONS/
WAUPUN CORRECTIONAL INSTITUTION, WAUPUN
/
SEG/HSU BUILDING
Berners-Schober Associates, Inc. $438,000 Pearce 4/15/2024 No
23J7B
(Proposal)
3/19/2024
Plan Holders
5/7/2024 Repair Stair Erosion and Drainage MILITARY AFFAIRS/
ONALASKA
/
ARMORY-ONALASKA
Kapur & Associates, Inc. $40,000 Yahnke No
23F1C
(Proposal)
3/20/2024
Plan Holders
5/2/2024 Deck Replacement and Roof Repairs NATURAL RESOURCES/
YELLOWSTONE LAKE STATE PARK
/
SHOP - VEHICLE & EQUIPMENT MAINTENANCE
Specialty Engineering Group LLC $164,700 Kirchstein No
23F2W
(Proposal)
3/21/2024
Plan Holders
5/2/2024 Warm Storage Building Repairs NATURAL RESOURCES/
WAUTOMA STATION
/
SHOP - VEHICLE & EQUIPMENT MAINTENANCE
Lien & Peterson Architects, Inc. $123,300 Zamzow 4/9/2024 No
23E4H
(Proposal)
3/18/2024
Plan Holders
5/1/2024 Segregation Road Asphalt Replacement CORRECTIONS/
GREEN BAY CORRECTIONAL INSTITUTION
/
SEGREGATION BUILDING
Burse Surveying & Engineering Inc $188,000 Wischhoff 4/19/2024 No
23H3D
(Proposal)
3/27/2024
Plan Holders
5/1/2024 Pavement Replacement CORRECTIONS/
BLACK RIVER CORRECTION CENTER, KOMENSKY
/
MULTI-BLDG
Professional Engineering LLC $258,000 Wischhoff 4/18/2024 No
22B3HREBID GPC 3/14/2024
Plan Holders
4/30/2024 Chimney Repairs
GPC Only.
UNIVERSITY OF WISCONSIN/
STOUT CAMPUS
/
HEATING PLANT & CHIMNEY
Larson Engineering, Inc. $2,000,000 Daniel 4/4/2024 No
23F3P
(Proposal)
3/19/2024
Plan Holders
4/30/2024 Reconstruct South Parking Lot MILITARY AFFAIRS/
FORT MCCOY
/
MILITARY ACADEMY
Kapur & Associates, Inc. $395,000 Yahnke 4/16/2024 No
23F5M
(Proposal)
3/15/2024
Plan Holders
4/30/2024 Multi-Building Window Replacement NATURAL RESOURCES/
PATTISON STATE PARK
/
SHOP - VEHICLE & EQUIPMENT MAINTENANCE
Meyer Group Architecture P C $117,500 Balciunas 4/9/2024 No
23J5P
(Proposal)
3/20/2024
Plan Holders
4/30/2024 Roof and Parapet Repairs UNIVERSITY OF WISCONSIN/
MILWAUKEE CAMPUS
/
Northwest Quadrant-Clinic Bldg (formerly CSM)
Engberg Anderson, Inc. $245,000 Hoffman 4/11/2024 No
21E2H MEP 3/25/2024
Plan Holders
4/25/2024 Williams Fieldhouse HVAC & Electrical Systems Replacement UNIVERSITY OF WISCONSIN/
PLATTEVILLE CAMPUS
/
WILLIAMS FIELDHOUSE
IMEG Corporation $5,400,000 Schorr 4/3/2024 No
21L1UREBID2 GPC 3/11/2024
Plan Holders
4/25/2024 Elevator Upgrades CORRECTIONS/
CHIPPEWA VALLEY CORRECTIONAL TREATMENT FACILITY
Lien & Peterson Architects, Inc. $770,000 Hoffmann No
22A1H MEP 3/12/2024
Plan Holders
4/25/2024 Eastern Tower Remediation MILITARY AFFAIRS/
VARIOUS LOCATIONS
Edge Consulting Engineers, Inc. $4,553,200 Wenzel 4/9/2024 No
22C4Q GPC 3/13/2024
Plan Holders
4/25/2024 X Building Heating Pipe Replacement CORRECTIONS/
DODGE CORRECTIONAL INSTITUTION, WAUPUN
Oneida Total Integrated Enterprises (OTIE) $500,000 Otremba No
23F5G
(Proposal)
3/21/2024
Plan Holders
4/25/2024 Multiple Building Roof and Window Replacements NATURAL RESOURCES/
JOHN MICHAEL KOHLER STATE PARK
/
TOILET - FLUSH
KonText Architects, LLC $270,000 Kolaszewski 4/11/2024 No
23G1S
(Proposal)
3/18/2024
Plan Holders
4/25/2024 Paving Phase 2 CORRECTIONS/
FOX LAKE CORRECTIONAL INSTITUTION, FOX LAKE
/
MULTI-BLDG
Collins Engineers, Inc. $380,000 Wischhoff 4/16/2024 No
23H3E
(Proposal)
3/15/2024
Plan Holders
4/25/2024 Kolb Center Pavement Replacement CORRECTIONS/
FOX LAKE CORRECTIONAL INSTITUTION, FOX LAKE
/
MULIT-PURPOSE BLDG
Collins Engineers, Inc. $148,000 Wischhoff 4/16/2024 No
18K2M MEP 3/25/2024
Plan Holders
4/24/2024 Type 1 Juvenile Corrections Facility CORRECTIONS/
VARIOUS
BWBR Architects, Inc. $54,885,000 Hoffmann 4/3/2024 No
22D3D GPC 2/29/2024
Plan Holders
4/24/2024 Replace Underground Fuel Storage Tank
GPC Only
MILITARY AFFAIRS/
FORT MCCOY
/
MATES-FORT MCCOY
GEI Consultants, Inc. $453,400 Archimede 4/2/2024 No
23C2B
(Proposal)
3/11/2024
Plan Holders
4/24/2024 Fish Return Pipe Upgrade NATURAL RESOURCES/
ROOT RIVER STEELHEAD
Foth Infrastructure & Environment LLC $65,000 Kalscheur No
23H1M
(Proposal)
3/18/2024
Plan Holders
4/24/2024 Water Heaters Replacement CORRECTIONS/
GORDON CORRECTION CENTER, GORDON
/
BUNKHOUSE
LHB Inc $215,000 Windus 4/10/2024 No
23I3L
(Proposal)
3/18/2024
Plan Holders
4/24/2024 Concrete Sidewalk Replacement UNIVERSITY OF WISCONSIN/
PARKSIDE CAMPUS
Christopher Kidd & Associates, LLC $350,000 Hall No
22B2R MEP 3/21/2024
Plan Holders
4/23/2024 HVAC Replacement and Addition of DDC TRANSPORTATION/
DSP - DISTRICT 6
/
DSP DIST HDQ-EAU CLAIRE
HVP Design, Inc. $550,000 Pearce 3/28/2024 No
22D3E MEP 3/14/2024
Plan Holders
4/23/2024 Construct Joint Operations Facility NATURAL RESOURCES/
MILITARY RIDGE STATE TRAIL
HSR Associates, Inc. $2,800,000 Schaefer 4/11/2024 No
22K3BREBID GPC 3/20/2024
Plan Holders
4/23/2024 Traffic Coating and Minor Repairs
GPC Only
ADMINISTRATION/
ADMINISTRATIVE FACILITIES
/
MONONA TERR PARKING FACILITY
Shive-Hattery $2,413,700 List 4/10/2024 No
23H1N
(Proposal)
3/14/2024
Plan Holders
4/23/2024 Door Replacements CORRECTIONS/
LINCOLN HILLS SCHOOL, MERRILL
/
MULTI - BUILDING
Berners-Schober Associates, Inc. $185,000 Kolaszewski 3/21/2024 No
24A1E
(Proposal)
3/18/2024
Plan Holders
4/23/2024 Chimney Stack Repairs UNIVERSITY OF WISCONSIN/
OSHKOSH CAMPUS
/
HEATING PLANT
Larson Engineering, Inc. $150,000 Jansen No
19J4E-02 GPC
Revised

3/1/2024
1/31/2024
Plan Holders
4/18/2024 New Health and Science Building
MEP moved to 4/4/24 / GPC moved to 4/18/24

Addenda to Date: 4
UNIVERSITY OF WISCONSIN/
EAU CLAIRE CAMPUS
Potter Lawson, Inc. $245,000,000 Anderson 2/14/2024 No
21K1P-02 EQUIPMENT 3/12/2024
Plan Holders
4/18/2024 Medium Voltage Switchgear Equipment Purchase
Bidders must be DOA Equipment Supplier certified.
UNIVERSITY OF WISCONSIN/
MILWAUKEE CAMPUS
/
HEATING PLANT - CENTRAL
Ring & DuChateau, LLP $120,000 Otremba No
23F2U
(Proposal)
3/15/2024
Plan Holders
4/18/2024 Shop Siding and Windows NATURAL RESOURCES/
BIG FOOT BEACH STATE PARK
/
SHOP - VEHICLE & EQUIPMENT MAINTENANCE
Strang, Inc. $105,000 Wischhoff 4/9/2024 No
23I3M
(Proposal)
3/21/2024
Plan Holders
4/18/2024 Muir Drive Street Lighting Upgrade
Less than 30 bidding days
HEALTH SERVICES/
MENDOTA MENTAL HEALTH INSTITUTE, MADISON
/
UTILITY - ELECTRICAL
Design Engineers $189,000 Whitley 4/3/2024 No
21H2F STC
Revised

3/26/2024
1/31/2024
Plan Holders
4/17/2024 HVAC and Controls Upgrade
STC Mechanical- Bid Date moved to 4/17 per Add 1

Addenda to Date: 1
VETERANS AFFAIRS/
WISCONSIN VETERANS HOME-KING
/
MULTI-BUILDING
Berners-Schober Associates, Inc. $3,236,500 Pearce 3/7/2024 No
21I2O GPC 2/28/2024
Plan Holders
4/17/2024 Ringling Brothers Business Office Restoration HISTORICAL SOCIETY/
CIRCUS WORLD MUSEUM, BARABOO
/
RINGLING HOUSE & GARAGE
InSite Consulting Architects, LLC $2,037,000 Wenzel 3/19/2024 No
23B1F GPC 2/20/2024
Plan Holders
4/17/2024 Climbing Wall Replacement UNIVERSITY OF WISCONSIN/
LA CROSSE CAMPUS
/
RECREATIONAL EAGLE'S CTR
Dan Beyer Architects $846,600 Yahnke 3/12/2024 No
23F3A
(Proposal)
3/15/2024
Plan Holders
4/17/2024 Flowage Repairs NATURAL RESOURCES/
NAVARINO WILDLIFE AREA
/
AGRICULTURE - BARN
Becher Hoppe Associates Inc $330,000 Kolaszewski No
23I2P
(Proposal)
3/11/2024
Plan Holders
4/17/2024 Campus Lab Farm Catch Basin Addition
Addenda to Date: 1
UNIVERSITY OF WISCONSIN/
RIVER FALLS CAMPUS
/
YOUNG HORSE TRAINING BARN
Cedar Corporation $54,000 Yahnke 3/26/2024 No
23I4I
(Proposal)
3/22/2024
Plan Holders
4/17/2024 Temporary Shoring
Less than 30 bidding days.
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
/
MUSIC HALL
InSite Consulting Architects, LLC $135,000 Quilling 4/5/2024 No
22K3A GPC 3/11/2024
Plan Holders
4/16/2024 Roadway and Parking Lot Improvements
GPC Only
HEALTH SERVICES/
SECURE TREATMENT FACILITY, MAUSTON
Kapur & Associates, Inc. $1,599,800 Yahnke 4/2/2024 No
23A3A
(Proposal)
3/15/2024
Plan Holders
4/16/2024 Trail Improvements NATURAL RESOURCES/
NORTHERN HIGHLAND STATE FOREST
/
CABIN
Clark Dietz, Inc. $199,000 Shumaker No
23E5M
(Proposal)
3/13/2024
Plan Holders
4/16/2024 Lighting Upgrade
Addenda to Date: 1
UNIVERSITY OF WISCONSIN/
PARKSIDE CAMPUS
Ring & DuChateau, LLP $125,000 Whitley No
23F2M
(Proposal)
3/15/2024
Plan Holders
4/16/2024 Window Replacement CORRECTIONS/
GORDON CORRECTION CENTER, GORDON
/
BUNKHOUSE
KonText Architects, LLC $183,400 Quilling 3/29/2024 No
23J1V
(Proposal)
3/12/2024
Plan Holders
4/16/2024 University Service Center Paving UNIVERSITY OF WISCONSIN/
SUPERIOR CAMPUS
/
UNIVERSITY SERVICES BLDG
Advanced Engineering Concepts $254,000 Wischhoff 4/5/2024 No
21L1UREBID2 MEP 3/11/2024
Plan Holders
4/11/2024 Elevator Upgrades CORRECTIONS/
CHIPPEWA VALLEY CORRECTIONAL TREATMENT FACILITY
Lien & Peterson Architects, Inc. $770,000 Hoffmann No
22B3N GPC 2/26/2024
Plan Holders
4/11/2024 Cooling Tower Replacement CORRECTIONS/
CHIPPEWA VALLEY CORRECTIONAL TREATMENT FACILITY
Grumman/Butkus Associates, Ltd. $590,400 Ewing 3/14/2024 No
22C4Q MEP 3/13/2024
Plan Holders
4/11/2024 X Building Heating Pipe Replacement CORRECTIONS/
DODGE CORRECTIONAL INSTITUTION, WAUPUN
Oneida Total Integrated Enterprises (OTIE) $500,000 Otremba No
22D3G
(Proposal)
2/29/2024
Plan Holders
4/11/2024 Shooting Range Expansion NATURAL RESOURCES/
TURTLE FLAMBEAU SCENIC WATERS AREA
Short Elliott Hendrickson, Inc. $265,000 Kolaszewski No
23E1P
(Proposal)
3/8/2024
Plan Holders
4/11/2024 Ceiling Replacements CORRECTIONS/
RACINE YOUTH OFFENDER CORRECTIONAL FACILITY
/
MULTI-BUILDING
Boer Architects Inc $52,000 Zamzow 3/20/2024 No
18K1G GPC 2/7/2024
Plan Holders
4/10/2024 Readiness Center Replacement
Addenda to Date: 2
MILITARY AFFAIRS/
VIROQUA
Assemblage Architects $25,000,000 Schaefer 3/14/2024 No
20L1E GPC 2/9/2024
Plan Holders
4/10/2024 Kitchen Renovations
Addenda to Date: 1
VETERANS AFFAIRS/
WISCONSIN VETERANS HOME-UNION GROVE
/
MAURER HALL
Assemblage Architects $6,400,000 Schaefer 3/7/2024 No
23F2H
(Proposal)
2/20/2024
Plan Holders
4/10/2024 Stairwell Repair UNIVERSITY OF WISCONSIN/
STEVENS POINT CAMPUS
/
COLLAGE OF L&S - COLLINS
Cedar Corporation $103,000 Wenzel 3/25/2024 No
21L3QREBID2 GPC 3/1/2024
Plan Holders
4/9/2024 Unit 4 Roof Replacement
GPC Only.
CORRECTIONS/
STANLEY CORRECTIONAL INSTITUTION, STANLEY
Lien & Peterson Architects, Inc. $592,000 Hoffmann No
19J4E-02 MEP
Revised

3/1/2024
1/31/2024
Plan Holders
4/4/2024 New Health and Science Building
MEP moved to 4/4/24 / GPC moved to 4/18/24

Addenda to Date: 4
UNIVERSITY OF WISCONSIN/
EAU CLAIRE CAMPUS
Potter Lawson, Inc. $245,000,000 Anderson 2/14/2024 No
23A1V GPC 2/9/2024
Plan Holders
4/4/2024 North Steam Improvements
Addenda to Date: 2
HEALTH SERVICES/
CENTRAL WISCONSIN CENTER, MADISON
K Singh & Associates Inc $3,000,000 Otremba 3/7/2024 No
21I2O MEP 2/28/2024
Plan Holders
4/3/2024 Ringling Brothers Business Office Restoration HISTORICAL SOCIETY/
CIRCUS WORLD MUSEUM, BARABOO
/
RINGLING HOUSE & GARAGE
InSite Consulting Architects, LLC $2,037,000 Wenzel 3/19/2024 No
23B1F MEP 2/20/2024
Plan Holders
4/3/2024 Climbing Wall Replacement UNIVERSITY OF WISCONSIN/
LA CROSSE CAMPUS
/
RECREATIONAL EAGLE'S CTR
Dan Beyer Architects $846,600 Yahnke 3/12/2024 No
23E4Q
(Proposal)
2/14/2024
Plan Holders
4/3/2024 Unit 14 and 15 Door Controls Upgrade CORRECTIONS/
KETTLE MORAINE CI-PLYMOUTH
/
MULTI - BUILDING
Powrtek Engineering, Inc. $450,000 Stehly 3/14/2024 No
22D2V GPC 2/15/2024
Plan Holders
4/2/2024 Fairchild Hall Safety and Maintenance Upgrades
Addenda to Date: 3
VETERANS AFFAIRS/
WISCONSIN VETERANS HOME-UNION GROVE
/
FAIRCHILD HALL
CMG & Associates, Inc. $1,360,000 Becker 2/27/2024 No
21K1P-01 EQUIPMENT 2/27/2024
Plan Holders
3/28/2024 Chiller Purchase
Bidders must be DOA Equipment Supplier certified.

Addenda to Date: 1
UNIVERSITY OF WISCONSIN/
MILWAUKEE CAMPUS
Ring & DuChateau, LLP $3,600,000 Otremba No
22B3N MEP 2/26/2024
Plan Holders
3/28/2024 Cooling Tower Replacement CORRECTIONS/
CHIPPEWA VALLEY CORRECTIONAL TREATMENT FACILITY
Grumman/Butkus Associates, Ltd. $590,400 Ewing 3/14/2024 No
22E2F
(Proposal)
2/15/2024
Plan Holders
3/28/2024 Cooler/Freezer Refrigeration Systems Replacement
Addenda to Date: 1
CORRECTIONS/
REDGRANITE CORRECTIONAL INSTITUTION, REDGRANITE
/
FOOD SERVICE
Henneman Engineering, Inc. $240,000 Stephan 3/12/2024 No
22F2Y GPC 2/8/2024
Plan Holders
3/28/2024 Elevator Installation
Addenda to Date: 1
UNIVERSITY OF WISCONSIN/
STEVENS POINT CAMPUS
/
HEALTH CENTER - PHY ED
Architects Group Limited $785,747 Braun-Oddo 2/26/2024 No
23D2D
(Proposal)
2/15/2024
Plan Holders
3/28/2024 1965 Meeting Room Remodel
Addenda to Date: 1
UNIVERSITY OF WISCONSIN/
GREEN BAY CAMPUS
/
STUDENT UNION
Architects Group Limited $135,000 Kolaszewski 3/11/2024 No



Notices of Proprietary Acquisition
Thursday, Mar 28 2024
Project NumberProject TitleAgency Name/InstitutionWork ByNotice DateContract Execution DateProject Manager
19F2Y-04 Camp Randall Stadium Renovation UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
Johnson Controls, Inc.3/30/20235/2/2024 Luttrell
21H2F HVAC and Controls Upgrade VETERANS AFFAIRS/
WISCONSIN VETERANS HOME-KING
Energy Control & Design, Inc2/2/20244/2/2024 Pearce
20L1E Kitchen Renovations VETERANS AFFAIRS/
WISCONSIN VETERANS HOME-UNION GROVE
Johnson Controls, Inc.2/13/20244/17/2024 Schaefer