List of Projects Out for Bid
Monday, Mar 1 2021
Project Number | Plans Available On | Bid Date | Project Title/Bid Documents | Agency/Institution/Building | A/E | Estimate Construction Cost | Project Manager | Prebid Tour Date | Prebid Tour Mandatory |
19A2I GPC
|
2/26/2021
Plan Holders
|
4/14/2021
|
Heating Distribution Upgrades
Addenda to Date: 1
|
ADMINISTRATION/
ADMINISTRATIVE FACILITIES
/HILL FARMS D BLDG
|
BWZ Architects
|
$2,870,000
|
Stephan
|
3/16/2021
| No |
19G3Q GPC
|
2/26/2021
Plan Holders
|
4/14/2021
|
Engineering Technology and Electronic Media Lab Renovations
Addenda to Date: 1
|
UNIVERSITY OF WISCONSIN/
GREEN BAY CAMPUS
/INSTRUCTIONAL SERVICE
|
SmithGroup, Inc.
|
$4,000,000
|
Homan
|
3/9/2021
| No |
18H2H AAC
|
2/25/2021
Plan Holders
|
4/13/2021
|
Veterinary Medicine Addition and Renovation
Addenda to Date: 1
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
/VETERINARY SCIENCE
|
Flad Architects
|
$94,500,000
|
von Below
|
3/10/2021
| No |
18H2H GPC
|
2/25/2021
Plan Holders
|
4/13/2021
|
Veterinary Medicine Addition and Renovation
Addenda to Date: 1
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
/VETERINARY SCIENCE
|
Flad Architects
|
$94,500,000
|
von Below
|
3/10/2021
| No |
18K1L GPC
|
2/23/2021
Plan Holders
|
4/8/2021
|
Field House Multiple AHU Replacement
Bid Opening in Eau Claire
Addenda to Date: 1
|
UNIVERSITY OF WISCONSIN/
STOUT CAMPUS
/SPORTS & FITNESS CENTER
|
HVP Design Inc
|
$800,000
|
Stephan
|
| No |
19H2F.01 GPC
|
2/23/2021
Plan Holders
|
4/8/2021
|
Steam Line Replacement Marquette to South Housing
Addenda to Date: 1
|
CORRECTIONS/
PRAIRIE DU CHIEN CORRECTIONAL FACILITY
/UTILITY - SITE
|
NV 5
|
$500,000
|
Otremba
|
| No |
19G2Y GPC
|
2/18/2021
Plan Holders
|
4/7/2021
|
HVAC System Renovation and Skylight Replacement
Addenda to Date: 1
|
UNIVERSITY OF WISCONSIN/
PLATTEVILLE CAMPUS
/KARRMANN LIBRARY
|
Strang, Inc.
|
$3,600,000
|
Coddington
|
| No |
20C2T
(Proposal)
|
2/23/2021
Plan Holders
|
4/6/2021
|
Roof Replacement
Addenda to Date: 1
|
MILITARY AFFAIRS/
ASHLAND
/ARMORY-ASHLAND
|
H Cad
|
$249,500
|
Kirchstein
|
3/17/2021
| No |
19K1G GPC
|
2/11/2021
Plan Holders
|
4/1/2021
|
Building B Air Tempering - Phase 1
Addenda to Date: 1
|
HEALTH SERVICES/
WISCONSIN RESOURCE CENTER, WINNEBAGO
/WIS RES CTR-HUGHES
|
Grumman/Butkus Associates, Ltd.
|
$2,200,000
|
Coddington
|
2/18/2021
| No |
19A2I MEP
|
2/26/2021
Plan Holders
|
3/31/2021
|
Heating Distribution Upgrades
Addenda to Date: 1
|
ADMINISTRATION/
ADMINISTRATIVE FACILITIES
/HILL FARMS D BLDG
|
BWZ Architects
|
$2,870,000
|
Stephan
|
3/16/2021
| No |
19G3Q MEP
|
2/26/2021
Plan Holders
|
3/31/2021
|
Engineering Technology and Electronic Media Lab Renovations
Addenda to Date: 1
|
UNIVERSITY OF WISCONSIN/
GREEN BAY CAMPUS
/INSTRUCTIONAL SERVICE
|
SmithGroup, Inc.
|
$4,000,000
|
Homan
|
3/9/2021
| No |
18H2H MEP
|
2/25/2021
Plan Holders
|
3/30/2021
|
Veterinary Medicine Addition and Renovation
Addenda to Date: 1
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
/VETERINARY SCIENCE
|
Flad Architects
|
$94,500,000
|
von Below
|
3/10/2021
| No |
20A1F GPC
|
2/12/2021
Plan Holders
|
3/30/2021
|
Steam Loop Improvements
Addenda to Date: 1
|
HEALTH SERVICES/
SOUTHERN WISCONSIN CENTER, UNION GROVE
|
Ring & DuChateau, LLP
|
$3,000,000
|
Otremba
|
2/25/2021
| No |
18K1L MEP
|
2/23/2021
Plan Holders
|
3/25/2021
|
Field House Multiple AHU Replacement
Bid Opening in Eau Claire
Addenda to Date: 1
|
UNIVERSITY OF WISCONSIN/
STOUT CAMPUS
/SPORTS & FITNESS CENTER
|
HVP Design Inc
|
$800,000
|
Stephan
|
| No |
19H2F.01 MEP
|
2/23/2021
Plan Holders
|
3/25/2021
|
Steam Line Replacement Marquette to South Housing
Addenda to Date: 1
|
CORRECTIONS/
PRAIRIE DU CHIEN CORRECTIONAL FACILITY
/UTILITY - SITE
|
NV 5
|
$500,000
|
Otremba
|
| No |
19L2H
(Proposal)
|
2/17/2021
Plan Holders
|
3/25/2021
|
Air Handling Units Replacement
Addenda to Date: 1
|
TRANSPORTATION/
DMV - DISTRICT 1
|
JDR Engineering Inc
|
$210,000
|
Coddington
|
2/25/2021
| No |
19L2K
(Proposal)
|
2/26/2021
Plan Holders
|
3/25/2021
|
Green Bay Boiler Replacement
Less than 30 bidding days
Addenda to Date: 1
|
TRANSPORTATION/
DBM - BUSINESS MANAGEMENT FACILITIES
|
Andhole Engineering LLC
|
$166,300
|
Uhrig
|
3/9/2021
| No |
19G2Y MEP
|
2/18/2021
Plan Holders
|
3/24/2021
|
HVAC System Renovation and Skylight Replacement
Addenda to Date: 1
|
UNIVERSITY OF WISCONSIN/
PLATTEVILLE CAMPUS
/KARRMANN LIBRARY
|
Strang, Inc.
|
$3,600,000
|
Coddington
|
| No |
19I2P GPC
|
1/25/2021
Plan Holders
|
3/24/2021
|
Parking Lots, Curbs, and Exterior Lighting
Addenda to Date: 2
|
ADMINISTRATION/
ADMINISTRATIVE FACILITIES
/WIS STATE LAB OF HYGIENE
|
KL Engineering, Inc.
|
$570,000
|
List
|
2/24/2021
| No |
19F2A GPC
|
2/18/2021
Plan Holders
|
3/23/2021
|
Boat Access Site
GPC Only
Addenda to Date: 1
|
NATURAL RESOURCES/
KETTLE MORAINE STATE FOREST-PIKE LAKE UNIT
|
Ayres Associates, Inc.
|
$610,000
|
Keasler
|
| No |
20E3A
(Proposal)
|
2/18/2021
Plan Holders
|
3/23/2021
|
Roof Replacement
Addenda to Date: 1
|
TRANSPORTATION/
DMV - DISTRICT 4
|
Building Envelope Professionals Group LLC
|
$98,000
|
Braun-Oddo
|
| No |
20J2E
(Proposal)
|
1/22/2021
Plan Holders
|
3/23/2021
|
Overhead Bay Door Replacement
Addenda to Date: 1
|
MILITARY AFFAIRS/
WHITEWATER
/OMS-WHITEWATER
|
Tactical Design North, Inc.
|
$150,700
|
Ward
|
| No |
18J2C GPC
|
2/1/2021
Plan Holders
|
3/18/2021
|
Hibbard Parking Lot Reconstruction
Bid opening in Eau Claire, WI
Addenda to Date: 1
|
UNIVERSITY OF WISCONSIN/
EAU CLAIRE CAMPUS
/UTILITY - SITE
|
Ayres Associates, Inc.
|
$1,000,000
|
Anderson
|
| No |
19H2X GPC
|
1/26/2021
Plan Holders
|
3/18/2021
|
Cottage Demolition and Restoration
Addenda to Date: 3
|
VETERANS AFFAIRS/
WISCONSIN VETERANS HOME-KING
/RESIDENCE 104
|
Edge Consulting Engineers, Inc.
|
$700,000
|
Schaefer
|
2/17/2021
| No |
19I1RREBID
(Proposal)
|
2/18/2021
Plan Holders
|
3/18/2021
|
Shower Repairs
Less than 30 bidding days
Addenda to Date: 2
|
CORRECTIONS/
RACINE YOUTH OFFENDER CORRECTIONAL FACILITY
/MULTI-BUILDING
|
Harwood Engineering Consultants, Ltd
|
$236,600
|
Lippitt
|
2/25/2021
| No |
19I1Y GPC
|
2/9/2021
Plan Holders
|
3/18/2021
|
Communication Tower Replacement
GPC Only
Addenda to Date: 1
|
TRANSPORTATION/
DSP - DISTRICT 5
/RADIO TWR-BLACK RIVER FLS
|
Edge Consulting Engineers, Inc.
|
$570,000
|
Anderson
|
| No |
19I2W
(Proposal)
|
2/12/2021
Plan Holders
|
3/18/2021
|
Lighting Upgrade
Addenda to Date: 1
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
/CS-HEATING/COOLING PLANT
|
JDR Engineering Inc
|
$240,000
|
Whitley
|
| No |
19K1G MEP
|
2/11/2021
Plan Holders
|
3/18/2021
|
Building B Air Tempering - Phase 1
Addenda to Date: 1
|
HEALTH SERVICES/
WISCONSIN RESOURCE CENTER, WINNEBAGO
/WIS RES CTR-HUGHES
|
Grumman/Butkus Associates, Ltd.
|
$2,200,000
|
Coddington
|
2/18/2021
| No |
15J2E-01REBID GPC
|
2/19/2021
Plan Holders
|
3/17/2021
|
Maurer Hall Roof Replacement
GPC ONLY - Less than 30 Bidding Days
Addenda to Date: 1
|
VETERANS AFFAIRS/
WISCONSIN VETERANS HOME-UNION GROVE
/MAURER HALL
|
TGAR Group Inc
|
$304,780
|
Ward
|
| No |
19C1P
(Proposal)
|
2/12/2021
Plan Holders
|
3/17/2021
|
Roof Replacement
Addenda to Date: 1
|
ADMINISTRATION/
ADMINISTRATIVE FACILITIES
/WI PUBLIC BROADCASTING CTR-ECB
|
Interstate Roof Systems Consultants Inc
|
$159,000
|
List
|
3/2/2021
| No |
20C2M
(Proposal)
|
2/12/2021
Plan Holders
|
3/17/2021
|
Site Lighting Replacement
Addenda to Date: 1
|
HEALTH SERVICES/
NORTHERN WISCONSIN CENTER, CHIPPEWA FALLS
/UTILITY - SITE
|
Timper Associates Engineers LLC
|
$210,000
|
McChesney
|
| No |
20D2H GPC
|
2/12/2021
Plan Holders
|
3/17/2021
|
Multi-Building Roof Replacement
GPC Only
Addenda to Date: 1
|
UNIVERSITY OF WISCONSIN/
LA CROSSE CAMPUS
/MULTI - BUILDING
|
Specialty Engineering Group LLC
|
$1,327,000
|
Alderman
|
3/2/2021
| No |
20A1F MEP
|
2/12/2021
Plan Holders
|
3/16/2021
|
Steam Loop Improvements
Addenda to Date: 1
|
HEALTH SERVICES/
SOUTHERN WISCONSIN CENTER, UNION GROVE
|
Ring & DuChateau, LLP
|
$3,000,000
|
Otremba
|
2/25/2021
| No |
18G1V STC
|
2/9/2021
Plan Holders
|
3/11/2021
|
Plumbing System Improvements
Single Trade - Plumbing
Addenda to Date: 2
|
HEALTH SERVICES/
CENTRAL WISCONSIN CENTER, MADISON
/MULTI - BUILDING
|
CMG & Associates, Inc.
|
$2,423,000
|
Uhrig
|
2/23/2021
| No |
20C1R
(Proposal)
|
2/18/2021
Plan Holders
|
3/11/2021
|
Central Heating Plant Boiler Feedwater Improvements
Less than 30 bidding days
Addenda to Date: 1
|
HEALTH SERVICES/
SOUTHERN WISCONSIN CENTER, UNION GROVE
/HEATING PLANT
|
Ring & DuChateau, LLP
|
$140,000
|
Otremba
|
| No |
20C3B
(Proposal)
|
2/18/2021
Plan Holders
|
3/11/2021
|
Heating Plant Variable Frequency Drive Replacement
Less than 30 bidding days
Addenda to Date: 1
|
CORRECTIONS/
JACKSON CORRECTIONAL INST., BLACK RIVER FALLS
/CENTRAL PLANT - I
|
Ring & DuChateau, LLP
|
$120,000
|
Otremba
|
| No |
20E1X
(Proposal)
|
2/5/2021
Plan Holders
|
3/11/2021
|
Roof Replacement - Rowe House
Addenda to Date: 1
|
HISTORICAL SOCIETY/
PENDARVIS - CORNISH MINERS HOMES
/TAMBLYNS ROW
|
Building Envelope Professionals Group LLC
|
$220,000
|
Braun-Oddo
|
2/16/2021
| No |
19F2V-01 STC
|
2/9/2021
Plan Holders
|
3/10/2021
|
System-Wide Electrical Metering and Electrical Equipment Upgrade
Single Trade- Electric
Addenda to Date: 1
|
UNIVERSITY OF WISCONSIN/
MILWAUKEE CAMPUS
/UTILITY - ELECTRICAL
|
Dolan & Dustin Inc
|
$990,000
|
McChesney
|
| No |
19G3M GPC
Revised
3/1/2021
|
1/8/2021
Plan Holders
|
3/10/2021
|
Instructional Space Renovation
GPC Bid Date rescheduled to 3/10. Bids open in EC.
Addenda to Date: 6
|
UNIVERSITY OF WISCONSIN/
STOUT CAMPUS
/FRYKLUND HALL
|
LHB Inc
|
$2,229,000
|
Quilling
|
1/19/2021
| No |
19I2P MEP
|
1/25/2021
Plan Holders
|
3/10/2021
|
Parking Lots, Curbs, and Exterior Lighting
Addenda to Date: 2
|
ADMINISTRATION/
ADMINISTRATIVE FACILITIES
/WIS STATE LAB OF HYGIENE
|
KL Engineering, Inc.
|
$570,000
|
List
|
2/24/2021
| No |
19K3I
(Proposal)
|
2/9/2021
Plan Holders
|
3/10/2021
|
Northern Industries Heating Pumps Replacement
Addenda to Date: 1
|
HEALTH SERVICES/
NORTHERN WISCONSIN CENTER, CHIPPEWA FALLS
/NORTHERN INDUSTRIES BLDG
|
MEP Associates LLC
|
$100,000
|
Uhrig
|
2/18/2021
| No |
19F2W GPC
|
2/1/2021
Plan Holders
|
3/9/2021
|
Parking Lot 17 Reconstruction
GPC Only
Addenda to Date: 1
|
UNIVERSITY OF WISCONSIN/
WHITEWATER CAMPUS
/UTILITY - SITE
|
Oneida Engineering Solutions, LLC
|
$472,000
|
Dapp
|
| No |
19G2A GPC
|
1/22/2021
Plan Holders
|
3/9/2021
|
Site Utility Distribution System Replacement - Phase 1
Bid Opening in Eau Claire, WI.
Addenda to Date: 2
|
UNIVERSITY OF WISCONSIN/
STOUT CAMPUS
/UTILITY - MECHANICAL
|
Ayres Associates, Inc.
|
$3,000,000
|
Otremba
|
2/3/2021
| No |
19I2K GPC
|
1/22/2021
Plan Holders
|
3/9/2021
|
Bleacher Replacement
Addenda to Date: 1
|
UNIVERSITY OF WISCONSIN/
PARKSIDE CAMPUS
/Sports Activity Center (PHYSICAL EDUCATION BLDG)
|
Partners in Design Architects Inc
|
$750,000
|
Dapp
|
| No |
20E2Y
(Proposal)
|
2/1/2021
Plan Holders
|
3/9/2021
|
Envelope Maintenance - Bowman Hall
Addenda to Date: 1
|
UNIVERSITY OF WISCONSIN/
STOUT CAMPUS
/BOWMAN HALL
|
Mead & Hunt, Inc.
|
$219,500
|
Quilling
|
2/16/2021
| No |
15L1TREBID2
(Proposal)
|
1/25/2021
Plan Holders
|
3/4/2021
|
HVAC Improvements
Addenda to Date: 1
|
TRANSPORTATION/
DTD - DISTRICT 1
/MULTI - BUILDING
|
JDR Engineering Inc
|
$203,000
|
Uhrig
|
2/18/2021
| No |
18A2C GPC
|
2/1/2021
Plan Holders
|
3/4/2021
|
Multi-Building Elevator Single Bottom Jack Replacement
GPC Only
Addenda to Date: 3
|
UNIVERSITY OF WISCONSIN/
MADISON CAMPUS
/MULTI - BUILDING
|
BWZ Architects
|
$2,925,000
|
Ward
|
2/11/2021
| No |
18J2C MEP
|
2/1/2021
Plan Holders
|
3/4/2021
|
Hibbard Parking Lot Reconstruction
Bid opening in Eau Claire, WI
Addenda to Date: 1
|
UNIVERSITY OF WISCONSIN/
EAU CLAIRE CAMPUS
/UTILITY - SITE
|
Ayres Associates, Inc.
|
$1,000,000
|
Anderson
|
| No |
19G1Z GPC
|
1/26/2021
Plan Holders
|
3/4/2021
|
Exterior Envelope Repairs
GPC Only
Addenda to Date: 1
|
UNIVERSITY OF WISCONSIN/
GREEN BAY CAMPUS
/MULTI - BUILDING
|
Specialty Engineering Group LLC
|
$4,859,000
|
Hoffmann
|
2/16/2021
| No |
19H2X MEP
|
1/26/2021
Plan Holders
|
3/4/2021
|
Cottage Demolition and Restoration
Addenda to Date: 3
|
VETERANS AFFAIRS/
WISCONSIN VETERANS HOME-KING
/RESIDENCE 104
|
Edge Consulting Engineers, Inc.
|
$700,000
|
Schaefer
|
2/17/2021
| No |
20I2D
(Proposal)
|
2/1/2021
Plan Holders
|
3/3/2021
|
Chiller 1 Rebuild
Addenda to Date: 1
|
UNIVERSITY OF WISCONSIN/
LA CROSSE CAMPUS
/CHILLER PLANT ADDITION
|
Ring & DuChateau, LLP
|
$80,000
|
Coddington
|
| No |
18I2Q GPC
|
1/15/2021
Plan Holders
|
3/2/2021
|
Laboratory Renovation
Addenda to Date: 3
|
UNIVERSITY OF WISCONSIN/
MILWAUKEE CAMPUS
/ENGINEERING-MATH-SCIENCE
|
Grumman/Butkus Associates, Ltd.
|
$2,300,000
|
Schorr
|
1/27/2021
| No |
18J2YREBID
(Proposal)
|
1/25/2021
Plan Holders
|
3/2/2021
|
Lawn Drainage Improvements
Addenda to Date: 1
|
ADMINISTRATION/
ADMINISTRATIVE FACILITIES
/WI EXECUTIVE RESIDENCE
|
Professional Engineering LLC
|
$80,000
|
List
|
2/11/2021
| No |
20G3E
(Proposal)
|
1/29/2021
Plan Holders
|
3/2/2021
|
Multiple Building Water Heater Replacement
Addenda to Date: 1
|
STATE FAIR PARK/
STATE FAIR PARK - WEST ALLIS
/SWINE BARN
|
Ring & DuChateau, LLP
|
$182,300
|
Lippitt
|
2/16/2021
| No |